[1]
M. K. Sharbatdar, S. Talatahari, and M. R. Mousavi, “<b>The Optimization of the Time-Cost Tradeoff Problem in Projects with Conditional Activities Using of the Multi-Objective Charged System Search Algorithm (SMOCSS)</b>”, TAKSAD, vol. 5, no. 3, pp. 178-194, Nov. 2016.