(1)
Sharbatdar, M. K.; Talatahari, S.; Mousavi, M. R. <b>The Optimization of the Time-Cost Tradeoff Problem in Projects With Conditional Activities Using of the Multi-Objective Charged System Search Algorithm (SMOCSS)</B>. TAKSAD 2016, 5, 178-194.